06/14/17: Renato completed an exterior painting project for our relatively large single family home in Stamford, CT last weekend. Project did not begin well especially with the prep, repair/carpentry work, but then Renato took full control and ensured that the work done was to our satisfaction. The final result is outstanding. Minor damage to window screens, gutters and plants. Ensure that your window screens, gutters, and shutters are numbered and stored indoors or if kept outdoor covered properly against the elements. The project can be extensively delayed due to rain and you may find yourself dealing with insects and/or flooding in basement and dirty/bent/ mismatched screens/gutters/shutters. Overall we had a good team working on our project and we are satisfied with the finished product. The house looks great!
Louis Polidoro established shoreline in 1975. His son Christopher Polidoro entered the company as President in 2007. Continually bringing fresh new ideas to the forefront has been a primary focus of our company from the beginning. Our loyal customer base knows they can always count on us to bring a unique and creative approach to the process of painting their homes in an environmentally friendly way.
According to Craftsman National Estimator, "High time difficulty factors for surface preparation and painting. Painting takes longer when heights exceed 8' above the floor. Productivity is lower when an application requires a roller pole or wand on a spray gun or when work is done from a ladder or scaffold. When painting above 8', apply the following factors:
One of the first considerations when it comes to interior house paint is the base. There are two schools of thought, each with their pros and cons. Some brands commonly sold to contractors for commercial projects are oil-based, meaning the chosen pigment is mixed with an oil derivative called alkyd. Oil-based paint provides thorough coverage, and the finished coat resists moisture well. However, oil-based paint releases a high level of volatile organic compounds (VOCs) as it dries, and it can only be removed from floors, brushes, and clothing with strong chemical paint thinners. In fact, many states have actually banned the use of oil-based paints because of their VOC levels and hazardous ingredients.
Before hiring a painter, you should get a detailed estimate from them. This should include costs for labor, materials, paint, and the timeframe of the project. Covering details upfront will prevent issues from emerging later on. Ask the painter if they charge for travel time, whether their estimate includes pressure washing and caulking, and any other questions you might have.
The Cutters. Someone with meticulous attention to detail and a steady hand should be assigned the job of "cutting in," or painting a straight edge where needed, such as along a wall where the ceiling does not get painted. Many products are available to assist, but none work as well as a person who's good at doing it freehand. Ensure this person is skilled (ask them to show you). A poor, jagged, wavy or splotched cutting-in job will jump out at you every time you walk by it. Why more than one cutter? This job is nerve-wracking and painful to hands and arms after a few days. You'll want to give this person a break after a few walls.
Compare offers. The painter offering the lowest rate may not always be the best painter for the job. Indeed, the total cost isn't the only factor to consider when choosing between multiple bids. You'll want to look at contracts side by side to ensure you're making an apples-to-apples comparison. Are the same materials being used? Are the same services included? Does the painter provide a warranty?
If you are painting for a client, skip the paint in the bucket, and use large trays. For faster completion and still quality results the 5 gallon bucket and strainer work great as well as a wood filler, 5-in-1 tool, screw gun (drill), metal joint compound tray, metal putty knife, wide drywall knife, mini hand-held paint containers (for brushes), and a mini-roller and corresponding nap (for edging, after cutting in with brush on the bottom, top and sides of wall, and the sides of ceilings, so that you don't see brush lines).
Most of a projects price is the cost of labor at $25 to $75 per hour. However, most contractors bid out based on the entire project which includes all work hours. Hourly rates are only useful if your pro asks to do the job as “time and materials.” However, be wary of this pricing structure, it usually shows the contractor is uncertain how long the project will take.
×