Following the same process as the primer, cut in the walls with your chosen paint. For best results, paint one wall at a time. This makes it easier to spread the paint while it’s still wet. Work from top to bottom, rolling the paint in V or W-shaped strokes. Before applying a second coat, wait two to four hours. Then proceed with the same process used for the first coat.
Prep work should include removing all loose paint, either with a pressure washer or by scraping; removing any trace of mildew using bleach and water or a commercial solution, and sealing or covering dark stains; caulking all seams, corners and around windows or trim; applying epoxy filler to repair serious woodwork problems; covering dark stains; sanding all rough surfaces, and priming the bare wood with a bonding primer.

Painting is one of the quickest and easiest ways to give your home's interior a facelift with dramatic results. Fortunately, it doesn't have to be that difficult. Home improvement stores offer samples that you can take home. With these samples, you can try a few colors in large swaths on your wall to see the how the paint interacts with the room's natural light. Compare it against design elements like pillows or furniture to see whether it will work with your overall décor.

Use a roller to paint the rest of the wall. A good method to use is the 'W method'. You start by painting a large 3 foot (0.91 m) square W on the wall. Then, without lifting the roller, you fill in the W.[7] You can paint a wall section-by-section, and do the walls one at a time for best results. It's generally a good idea to use an extension pole for your roller instead of standing on a ladder. Make sure that neither the extension pole nor the roller has plastic handles, as plastic handles are flexible and this makes it difficult to control the painting.


Most of a projects price is the cost of labor at $25 to $75 per hour. However, most contractors bid out based on the entire project which includes all work hours. Hourly rates are only useful if your pro asks to do the job as “time and materials.” However, be wary of this pricing structure, it usually shows the contractor is uncertain how long the project will take.
×